×

Warning

JFolder: :files: Path is not a folder. Path: /home/scadiaco/public_html/nuevoscadia/images/EST_TER_SKCG

×

Notice

There was a problem rendering your image gallery. Please make sure that the folder you are using in the Simple Image Gallery plugin tags exists and contains valid image files. The plugin could not locate the folder: images/EST_TER_SKCG

Pre-Feasibility Study and Conceptual Architecture New Airport Cartagena / Colombia - SKCG

Contracting: CONECTA CARIBE - 2016

The main project was the development of a brand-new airport infrastructure, including airside runways, taxiways, apron, and land side passenger terminal, cargo terminal and support facilities, all under the RAC / IATA / ICAO regulations for a domestic and international operation, to attend the projected demand on the horizon of 2025 until 2070.

The 1st terminal concept was a 45,000 m2 building, for 7.3 million pax/year, with an expansion planning according to the future projection for Airside, and Landside infrastructures.

{gallery}EST_TER_SKCG{/gallery}